Energy projects require capital long before they become operational. The funding structure should reflect that. A solar, battery storage or wider energy infrastructure project does not move directly from signed contract to operational asset. There may be design costs, supplier deposits, equipment manufacture, staged payments, site works, installation, grid connection, testing and commissioning before the...